  • Pipe Insulation Adventures

    Now that our boiler job is complete, I’m going through and insulating all of the near-boiler pipes, which put off quite a bit of heat. First priority is the primary loop (1-1/4″ copper), followed by the secondary loop for the indirect water heater (1″ copper), followed by the DHW piping near the indirect (3/4″ copper),…