Kind of a lazy weekend so far. It’s too cold to really want to go out and do anything, so everyone is just puttering around the house. Yesterday I drained the pool water back down below the tile line. First time doing that so far this winter. Since closing, the water had crept back up several inches. Before that, we hit Macaroni Grill for an early lunch to celebrate my b-day, and I picked up some telecom equipment at Home Depot so I can work on rewiring the phone jack in the master bedroom. I have never wired a 66 punchdown block before, so this is going to be a learning experience. I think I am going to use the 66 block to replace the existing screw-terminal phone junction in the boiler room, which is a bit of a bird’s nest. It’s going to take a little planning. I will probably end up taking a day off work to do it, on a day when I can have the house to myself.
Today I have mainly been working on spackling and sanding the trim in the master bedroom, in preparation for painting. Most of the prep work has been concentrated on the trim. Years ago, someone decided to mount a phone jack near the entrance to the bathroom, so they tapped into an existing jack behind the bed and ran phone wire along the trim to the new jack. The wire was meticulously tacked along the baseboard, up one door opening, over three doors, back down, across more baseboard, up and over the bathroom door, and finally back down to the jack. It was really quite impressive, especially considering they could have run it through the basement, which would have taken about half the time, used about half the wire, and resulted in a nice, concealed wiring job instead of a massive eyesore. But, I digress. Anyhow, I pulled out all the wire, which was (of course) covered with several layers of paint, leaving me with a big patch and spackle job. But it’s almost done now, and soon we’ll be painting. Can’t wait.