River bank repair

With bad weather threatening for tomorrow, I decided to do a longer ride this morning.  I rode out to New Cut Rd, then River Rd, then through the park.  Today, part of River Rd was down to one lane for construction work.  It looks like they’re doing some sort of restoration/shoring up of the river bank along the road, to try to alleviate future flooding.  Hopefully it’ll help.

Assuming the weather forecast holds up, I’ll either be not riding tomorrow, or taking the shortest ride in possible.  I packed rain gear along today, just in case the weather sours earlier than forecasted (not that that ever happens around here in winter).